First INCA PBO Installation
HEIGHTS (UK) is to install it's first INCA PBO ULTRA in a London based publication house.
Severity: 8192
Message: Non-static method Switchee::usage() should not be called statically, assuming $this from incompatible context
Filename: switchee/pi.switchee.php
Line Number: 9
HEIGHTS (UK) is to install it's first INCA PBO ULTRA in a London based publication house.
HEIGHTS (UK) will be exhibiting at Labelexpo Americas between 09-11 September 2014.
Our list of Partners that we work closely with.